Gearbox By Omeroglu Metallurgy Co.Ltd.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Gearbox
Next

Gearbox

2 ~ 8 / ( Negotiable )

|

10000 Kilogram Minimum Order

Pays:

Turkey

N ° de modèle:

-

Prix FOB:

2 ~ 8 / ( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

2

Commande minimale:

10000 Kilogram

Packaging Detail:

Bigbag, wooden box

Heure de livraison:

Max.20 days after payment recieved

Capacité de Fournir:

60000 Kilogram per Month

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Kadir

T.Ziyaeddin Cd.No:31, Konya, Konya

Contacter maintenant

Spécification du produit

  • Brand Name: Custom Manufactured

La description

Omeroglu Metalurji have involved iron, ductile (nodular) iron and steel casting business since 1991.Our company owner's exprience on casting business is for more then 40 years.Our product are agricultural equipment parts,automotive parts,valves,elevator system and machinery parts and etc.We are casting agricultural machinery parts such as gearbox bodies, frontal covers,rear covers,rods,gears,valve bodies,bonnets,flanges,stems for world renowned Turkish companies.Our casting capacity per unit is between 1 kg to 5 tons.We want to help you for your machine parts and other casting products with our quality and experience. Our manufacturing schedule is here below, Manufacturing Schedule; Our typical manufacturing schedule starts with the recieving order from our customers. According to the order ,it requires to prepare the raw materials such as pig iron,scrap steel etc. And also requires manufactured materials such as cores. So pattern and core boxes which has been sent from our customers are prepped for the production. Core room starts working first, and gets cores ready for molds which are being made.Meanwhile mold halves ( upper and lower ) are made and placed to the assembly area.At the assembly area, molds are flow coated and cores are set in place. The mold is then closed up for pouring. After molds are staged on line,melted raw materials with our electircal induction furnace brougth to the molds and pouring process starts. Once poured, the molds are allowed to cool before next being sent to the shakeout. At the shakeout, the castings are separated from the sand mold. The sand is sent to a reclamation system so that it can be reused in the molding process.After shakeout is done,castings are sent to the cleaning room where they are prepared for costumers specifications. Processing in the cleaning room includes shot blasting, cut-off, welding, heat treating and inspection. 1-Receving order

2-Schedule

    a)Core Making

       a-1)Molding

          a-1-a)Flow Coat

          a-1-b)Assembly

    b)Melting

       b-1)Spectro

3)Pouring and Shakeout

4)Cleaning room

    a)Shot-blast

    b)Cut-off

    c)Welding

    d)Grinding

    e)Inspection

    f)Heat treatment
Image result for gearboxImage result for gearbox

Pays: Turkey
N ° de modèle: -
Prix FOB: 2 ~ 8 / ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: 2
Commande minimale: 10000 Kilogram
Packaging Detail: Bigbag, wooden box
Heure de livraison: Max.20 days after payment recieved
Capacité de Fournir: 60000 Kilogram per Month
Payment Type: L/C, T/T
Groupe de produits : Motor parts

Send a direct inquiry to this supplier

To:

Mr. Kadir < Omeroglu Metallurgy Co.Ltd. >

Je veux savoir: